A data-centre campus planned as the catalyst of a township, not a standalone consumer of power and water. The campus pays for the spine and owns none of the town.
Scroll
01 The unwanted neighbour
A city council votes, unanimously, against a data centre.
In Tucson the vote ended Project Blue. In Johor the state committee turned away of foreign operators' applications in its first five months. Across the United States, of adults oppose one in their area. Water, the power bill and secrecy are the reasons given.
01 Liverpool · 1715 to 2001
A dock built a city. Then the dock left.
Nobody in 1715 called the dock an unwanted neighbour, but it was noisy, dirty and it ate the waterfront. The infrastructure chose the city; the city outlived it. Scrub the years to watch the plan fill in, and empty.
01 Precedents
Towns that grew from an anchor, on one clock.
Population against years since the anchor arrived: Liverpool, Suzhou Industrial Park, Binh Duong and VSIP, Hershey, Songdo and Forest City. Hover to read a value; click a town for its anchor, its story and its sources. Switch to the research towns for four science cities on the same clock.
01 What came first
China's planned new cities, in the order they were built.
Dated milestones in five lanes. In Suzhou roads and the first factories came within a year of the start; in Tianjin the first factory broke ground within a year. Homes came the same year or after. Kangbashi put homes on sale and moved in its government offices with no industry of its own. In Xiong’an homes came before industry; Gui’an built its anchor and a university town first, and the town around them stayed thin.
02 Evidence base
What one megawatt brings, sourced.
The figures behind the plan, grouped as jobs, draws, people, land, water and power. Each shows the value used, its low and high where the sources give them, and says whether it is a benchmark, a standard or a design target. Open any tile for its source.
03 Vision and principles
Six principles, and what proves them.
The rules the plan follows, and the town that proves each one. Where no town in the evidence proves a principle, the card says so: it is the plan’s own choice. Hover, tap or tab to a card.
- Catalyst first.
- The buffer is a park.
- Industry before homes.
- Homes released against jobs.
- A trust holds the amenities.
- Plan to outlive the anchor.
03b The draws
The campus pays few wages. What it draws builds the town.
A campus employs few people for its size. Maintenance contractors, hardware refresh, research, digital firms, Industry 4.0 factories and the services they all use bring the rest. In this scenario the town's economic base is jobs, of which are on the campus payroll.
04 Masterplan
The drawing is the land budget.
Each zone is drawn as a band around the campus, and each band's area is the land the model gives that use, at one true scale. Move the campus load and the township redraws itself. In this scenario it needs ha gross, roads and utilities included.
05 Networks
Four networks, one spine.
Mobility, utilities, fibre and blue-green run along one spine, so the campus invests once, at district scale. Sewage becomes cooling water, rain is stored in the buffer lakes, refuse becomes power and heat becomes hot water. In this scenario ML a day is reclaimed against ML a day of cooling demand.
06 Growth and phasing
No home before the jobs that fill it.
Scrub twenty years. The industrial and supplier-ring land is serviced in year 0, before any home is sold. The campus draws its load from year 1, and the first homes follow the first campus jobs; the supplier ring, the factories, the digital park and research fill in over the years after, and schools and clinics open ahead of the people they serve. The three checks are dates on the plan’s fixed reference schedule: they show when it reaches each mark, and hold nothing back.
08 Key considerations
What breaks a township, and what holds it.
Water, power, flood, noise, the anchor leaving, slow demand, social tension and governance, placed by how likely each is and how much it would hurt. Click a risk to see what answers it and the evidence behind it, with a cautionary case where there is one.
09 The standard and next steps
A standard to build to, and the ask.
The rules the plan builds to, each in force or adopted as a target somewhere, with the place it holds and its source; the ones not yet binding are marked. Then what it takes to move the reference model onto a real site.
The ask
- A site. About ha for this scenario at full build, the last year on the phasing clock, with its boundary, its title and room to grow.
- An anchor. A campus operator committed to the catalyst plot and to the standard.
- Firm power. A grid connection offer for the campus load, and land for the firm supply the rules ask for.
- Water. A raw-water allocation, and the right to reclaim the town’s sewage for cooling.
- A planning partner. The state and the council adopting the land budget, the buffer and the phasing schedule, with its checks made binding.
- Ground truth. Flood, soil and survey work, and the villages already on and around the site.
Sources
Where every number comes from.
Every benchmark, standard and design target behind these pages, every precedent town and every dated milestone, with its publisher, its date and a link. Open a name to see what it supports, or filter by a town, a publisher or a figure.
07 Social fabric and integration
A town people choose, not a camp they endure.
The construction crews peak early and leave, so the workers' village is built to become the first neighbourhood. The plan sells homes rather than renting them, so residents own a stake, and of the homes in this scenario are affordable. Schools and clinics open ahead of the people who need them, and the existing village at the town edge is kept and joined to the town by the cycle grid.